Panipat, IndiaWholesale & export ◆ MOQ 1,000 pcs per style ◆ Private label on request+919350874209sales@nestivadecor.com
Ordering

Minimum Order Quantities and Lead Times When Importing from India

Learn how MOQs and lead times work for handmade home textiles from India, and how to plan orders, samples and shipping for US stores.

Two numbers shape almost every import decision: the minimum order quantity and the lead time. Both come up in the first conversation with a supplier, and both can be negotiated more easily when you understand why they exist. This guide explains them for handmade home textiles from India.

What MOQ means

MOQ is the smallest quantity a supplier will produce in one order. For handmade goods, there are a few typical reasons for it: yarn and raw material are bought in lots, dyeing needs a minimum batch, weaving looms and artisans are scheduled in blocks, and the cost of packing and shipping must be covered.

At Nestiva Decor the MOQ is 1,000 pieces per style. You can combine different styles and categories in one order, as long as each style meets the minimum. Custom requests are handled on request.

MOQ per style, per color or per order

Always ask which one applies. A MOQ of 1,000 pieces per order allows many styles to share the total. A MOQ per style or per color means each design must reach the minimum. Buyers who want many small variations should ask whether suppliers will combine them into one lot.

Ways to work with a MOQ

  • Mix categories: combine rugs, baskets and cushion covers into one order if your supplier allows it.
  • Standardize colors: fewer color variants make each lot larger and cheaper to produce.
  • Share with partners: if you sell through a group or distributor, pool orders.
  • Start with core styles: pick two or three best sellers per category for the first order.

What lead time means

Lead time is the time between your confirmed order (usually after sample approval and deposit) and the goods being ready to ship. It does not include ocean freight or customs clearance. Typical elements include raw material sourcing, dyeing, weaving or braiding, finishing, quality checks, and packing.

Because lead time depends on product, quantity, season and the production partner's schedule, we give it on request for each quote rather than publish a single number.

Factors that lengthen lead time

  • Custom colors or sizes that need new dye lots or patterns
  • Complex techniques such as dense tufting or detailed embroidery
  • Busy seasons, especially before holidays
  • Late sample approval or changes after production starts
  • Special packaging or labeling

Work backward from your selling date

Start from the date goods must be on your shelves, then subtract transit and clearance time, then the production lead time, then sampling. This usually means placing seasonal orders many months ahead. If you are planning holiday products such as embroidered Christmas covers or a braided tree skirt, begin early.

The order timeline in practice

  1. Share your assortment, quantities and destination.
  2. Receive a quote and approve samples.
  3. Confirm the order and pay the agreed deposit.
  4. Production and quality checks.
  5. Packing, loading and shipping from India.

Free delivery thresholds

Our terms include free delivery on orders above 10,000 pieces per style. Always ask exactly where "delivery" ends so you can compare quotes on the same basis, for example FOB India port versus delivered to a US port.

Sampling and approval take time too

Lead time quotes usually start from an approved sample, so the sampling stage deserves its own plan. A new buyer typically receives a sample, reviews it, requests changes, and may repeat the loop before approving. Each loop adds days for making and shipping the sample. If you are working to a seasonal deadline, begin sampling as early as you can and approve quickly once you are satisfied, because the production clock often does not start until approval and deposit.

A simple planning example

Suppose you want a set of cushion covers on your shelves before a holiday. Start from that date and work backward: allow time for customs clearance and delivery to your store, then ocean freight, then production, then sampling and approvals. Add a buffer for delays, because weather, port congestion and festivals can affect schedules. The exact timings depend on the product, the quantity and the season, so ask your supplier for their current estimates rather than relying on general rules.

Communicate changes early

Changes after production starts, such as a different color or a packaging update, can delay delivery or require a new minimum. If you are likely to change something, say so before you pay the deposit. Clear written specifications, reference photos and a signed-off sample reduce misunderstandings on both sides.

Questions to ask any supplier

  • Does the MOQ apply per style, per color or per order?
  • Can categories be mixed within the MOQ?
  • What is the lead time for my specific style and quantity?
  • What happens if the lead time slips?
  • What is the sample policy and cost?

Our wholesale page sets out how we handle quotes, and our FAQ covers common questions. To begin, send an inquiry.


Keep reading

Questions about sourcing?

Tell us what you are planning and we will point you to the right styles and quantities.

Request a quote Wholesale terms